Events Centre Feb/Mar 2011

Original Filename: 010411_events_centre_056.jpg (view)

Original Size: 3 MB

Original Image Type: image/jpeg

Events Centre Feb/Mar 2011.

Caption

Construction of Events Centre between February and March 2011. The central core with toilets on the ground floor, lighting/sound box on the next level and plant room on top floor. The access openings are visible in this picture taken from the Council yard. The first of the steel framing for the foyer can be seen to the right. The overlapped front concrete block wall is to provide a front wall for the cleaners room which is located in the 'v' at the edge of the central core and goes back toward the auditorium.

Discuss This Topic

There are 0 comments in this discussion.

join this discussion