All Results in images

showing 296-300 results of 327 [
]
Event Centre Feb/Mar 2011.
Events Centre under construction in the period of February and March 2011. Shows the other side of the central core of the building which houses the toilets and the lighing/sound
Turning of the Sod ceremony 8 October 2010.
Speech from John Haye, MP for the Wairarapa.
Event Centre Feb/Mar 2011.
The construction of the Events centre during the Feb/Mar 2011 period. This shows the crane from Progressive Engineering putting in place the large ply panels supplied by Junken NZ (JNL).
Turning of the Sod ceremony 8 October 2010.
The mayor and the Chairman of the Carterton Events Centre Trust at the turning of the sod ceremony.
Event Centre Feb/Mar 2011.
The construction of the Carterton Events Centre, progress in Feb/Mar 2011. Looking at the front of the main auditorium. The large concrete block structure houses the main toilets, the lighting/sound